Sign In | Join Free | My xpshou.com
China ZNLS ENGINEERING CO., LTD. logo
ZNLS ENGINEERING CO., LTD.
ZNLS ENGINEERING MOST EXCELLENT FORMWORK SOLUTION
Active Member

9 Years

Home > Automatic Climbing System >

Advanced Design Automatic Climbing System For High Building AC50-2

ZNLS ENGINEERING CO., LTD.
Contact Now

Advanced Design Automatic Climbing System For High Building AC50-2

Brand Name : ZNLS

Model Number : PF-AC50

Place of Origin : China

MOQ : 25 tons

Price : Negotiation

Payment Terms : 30%TT, Balance against copy of BL

Supply Ability : 400 to 500 tons per month

Delivery Time : 14 to 21 days after deposit

Packaging Details : In bundle or pallets, or by customer demands

Raw Material : Steel

Surface treatment : Powder coated

Lifting method : Self Climbing , Hydraulic Drive

Load capacity : 5 tons

Integrated platform no. : 4 platforms for independent work

Climbing rail : Different length available

Contact Now

AC50-2 Automatic climbing formwork - Fast, efficient auto-climbing formwork system for High Building

Overview

Auto-climbing system AC50-2 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for construction.

Characteristics

1 . The self-climbing hydraulic is equipped with an operating platform. As such, workers are not required to do the set-up and this help to save on manpower and materials.

2 . There is low error rate in the construction of the structure. Errors can be easily rectified at each level.

3 . The formwork is able to climb automatically and to be cleaned onsite. As such, this will significantly increase crane operational efficiency.

Climbing Process Flow

1 . Erect formwork, use cone suspension and lateral bracing to secure the formwork. Commence the first round of concrete pouring.

2 . Dismantle the formwork and install the Anchor shoe. Lift the bracket and formwork, install the middle platform, position the formwork correctly and commence on the second round of concrete pouring.

3 . Raise the formwork and brackets to a higher level, attached the guard rail, hydraulic system and suspended platform.

4 . Close formwork and commence on the third round of concrete pouring.

5 . Dismantle the formwork and shift it backwards, attached it on the wall and climb rail.

6 . The Brackets reached its designated position.

7 . Close formwork, commence on the concrete pouring, and the standard climbing process commences.

Advanced Design Automatic Climbing System For High Building AC50-2


Product Tags:

Self Climbing Scaffold System

      

Self Climbing Formwork System

      
China Advanced Design Automatic Climbing System For High Building AC50-2 wholesale

Advanced Design Automatic Climbing System For High Building AC50-2 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: ZNLS ENGINEERING CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)